Berlin --:--Wednesday, 14 October 2026
LIVE
BulgariaNEWSFACTSCONTEXT
Bulgaria ·

Danube Bridge at Ruse down to one lane for two weeks

From Oct. 19, traffic on a 320-metre section will alternate every 20 minutes, Monday to Thursday. The main renovation is due to finish by Dec. 3.

Archive image: Bulgarian side of the Danube Bridge at Ruse

Archive image · Photo: NAC / Wikimedia Commons, CC BY-SA 4.0 (cropped and resized)

Traffic on a 320-metre section of the Danube Bridge at Ruse will be limited to one lane for two weeks, with work carried out only Monday to Thursday. Vehicles will be let through in alternating directions every 20 minutes, directed by flaggers. The first stage runs from 9 a.m. on Oct. 19 to 5 p.m. on Oct. 22 with the right lane closed; the second runs from Oct. 26 to 29 with the left lane closed.

Crews will install drainage elements at the expansion joints as part of the bridge's main renovation. The deck surface was renewed and traffic restored in June, and work since then on the substructure has not affected traffic. The schedule may shift in bad weather. The main renovation is due to be completed by Dec. 3, 2026.

More from this section

← Bulgaria